Background Image
Previous Page  6-7 / 12 Next Page
Information
Show Menu
Previous Page 6-7 / 12 Next Page
Page Background

logistics

logistics

and many of our competitors don’t have that – they

farm it out. But we have the capability to do the archi-

tectural and the structural design early on. Second is

our quality. We don’t sell products that just meets the

minimum specs - we provide product that will exceed

the specifications. Third is our ability to handle the

project, turn-key, in terms of doing all the engineering,

the manufacturing, the delivery, and then provide the

project management, on-site, to be able to assemble

the bridge and meet a very tight timeline. Generally

our bridges can be assembled and set within one to

two days.”

Another advantage that Big R Bridge has over its com-

petition is its ability to combine many products at the

same job site for the same customer. “We tend to op-

erate in niches, but the thing that ties all our products

together is they’re all infrastructure-related, they’re all