St. George Regional Airport

Schedule an event at the Dixie Center for a group of 5 to 5000. dixiecenter.com Outside, Incredible. Inside, Impressive. GZ_DixieCenter_7.5x4.9.indd 1 12/18/19 1:14 PM ST . GEORGE REGIONAL A I RPORT “And, in all my years of working in an airport, it was the smoothest, best-run project I have ever worked on,” he adds. “The contractor, JP Excavating Inc., was absolutely amazing. The owner of the company, Judd Palmer, was here on the job, three months out of the four. If there was something that needed to be done, it was done instantly. And by the end of the second month, he was two weeks ahead of schedule. Also, during that four-month period, we had one rainstorm and it dropped just enough to keep the dust down. Normally, we have monsoon season here August through September – didn’t have it this year. So, it was one of those things; the project went off, basically, without a hitch. We were incredibly lucky.” “While the Airport was closed, we did other projects,” Stehmeier continues. “We moved and recertified our visual landing system; we doubled the parking and we added almost 218 new rental car locations; we fog-sealed and repainted the entire parking area; we expanded

RkJQdWJsaXNoZXIy MTI5MjAx